Location: Potomac, MD
ReAgg supplied RC-6, Imbricated Rip Rap, Rip Rap Class 1, #3 stone, Pebble Lime, RC 3 to 5, and CR-6 for the excavation of the site and installation of the bioretention pond at this 28,000 sq. ft. multi-family residence in Potomac, MD. The project included demolition, clearing, excavation, erosion control, and bioretention pond installation.
ReAgg provided a variety of aggregates and materials essential for site preparation, excavation, earthwork, and stormwater management on this residential development.