Location: Washington, DC
ReAgg supplied approximately 200,000 tons of aggregate—including #57 stone, GAB, #8 stone, RC-2, and Stalite—for the South Capitol Street Bridge project. These materials were essential for road base installation, sediment control, embankment stabilization, and bridge protection along the Anacostia River.
ReAgg delivered high-volume aggregate support to help build and stabilize this major infrastructure project in the heart of Washington, DC.